Push the pipe cap onto the pipe until its edge reaches the depth mark.
Capping off toilet waste pipe.
Many of today s drainpipes are pvc.
Remove the gasket and its remnants.
Sink disconnect pipes place end caps to water pipes disconnect out let pipe cut of to desired place cap of pipe.
If the floor flange for the toilet is set in concrete the job will be a lot more difficult than if it s on the second floor for example and the flooring can be removed to permanently close off the pipe.
End cap for main drain out let.
Cap the pipes.
Slice off a bit of the top of the pipe embedded in the floor.
To permanently close off the pipe in a concrete slab the floor flange should be removed and the pipe capped below the floor surface.
Get a cleanout or expandable test plug that fits.
Pull the toilet up and out of the way.
The mark will tell you when the fitting is pushed on all the way which is essential for a proper seal.
Measure from the end of each pipe and make a depth marking as directed by the push on fitting manufacturer.
Sink 50mm 2 inch cap.
Water pipe 1pm caps.
You could also probably chip it out with a knife sharp chisel.
Unscrew sink lift away.
Plumbers will stock caps you will need to measure across pipe axample 100m 4 inch main pipe cap.
Capping them requires the use of a pvc cleaner and a pvc glue to hold the new cap securely.